Leo A Daly office space build-out located in Miami was completed late 2019 adding a new and fresh look. Scope included tenant finish out of an existing office building on the ground floor and consisted of removal metal stud framed partitions, doors, partitions, installations of all finishes. The construction project was able to maintain a fully sprinkler and fire-alarmed system renovation. Upon award, T&G worked with the client and used buyout savings to get a few previous value engineer items back into the scope of work.